Friday, February 6, 2009

HDB/CONDO RESALE FLAT PACKAGE

everlinetellsastoryinteriors
HDB/Condo Resale Flat Package
3-room @ SGD$1,688* 4-room @ SGD$2,888*
5-room @ SGD$3,888* Executive @ SGD$4,888*

Professional Services :
Design Consultation
Space Planning
Perspective Drawings
Material & Colour Proposal
Project management
Site Supervision

Renovation Items^:
Demolishment Works
Demolish existing flooring for Living & Dining
Demolish existing flooring for Store & Bedrooms
Demolish existing flooring for Kitchen
Demolish existing wall tiles for Kitchen
Demolish existing flooring for 02 Bathrooms
Demolish existing wall tiles for 02 Bathrooms
Demolish existing skirtings for Whole unit
Dismantle existing sanitary wares & accessories for 02 Bathrooms
Haulage service & debris disposal

Masonry Works
Homogenous flooring (600mm x 600mm) c/w skirting at Living & Dining
Laminated flooring c/w skirting at All Bedrooms
Ceramic wall tiles till ceiling height for Kitchen
Homogenous non-slip flooring at Kitchen
Waterproofing membrane for Kitchen
Ceramic wall tiles till ceiling height for Main Bathroom
Ceramic wall tiles till ceiling height for Common Bathroom
Homogenous non-slip flooring at Main Bathroom
Homogenous non-slip flooring at Common Bathroom
Waterproofing membrane for 02 Bathrooms
50mm cabinet base c/w tiles finish
50mm fridge base c/w tiles finish
50mm washing machine base c/w tiles finish
50mm shower kerb c/w tiles finish at Main Bathroom

Plumbing Works
Standard cold copper piping for Whole unit
Connection of inlet & outlet piping for kitchen sink
Supply & install 02 sets of standard water closet
Supply & install 02 sets of standard wash basins & cold taps (w/o pedestal)
Provide labour to install accessories for 02 bathrooms
Provide labour to install 01 no. of water heater

Ceiling Works
L-box light holder at Living
False ceiling at Dining
False ceiling at Foyer
False ceiling at Bedrooms' passageway

Kitchen Cabinet
L20ft run laminated ply kitchen cabinet with ABS door trimmings
L10ft solid surface kitchen worktop
01 no. of 2-tier stainless steel dish drainer
Imported designer handles
01 no. of cutlery tray
Provide labour to install cooker hood & hob

Miscellaneous Works
Painting of whole unit (wall & ceiling) with ICI emulsion paint
Painting of all pipes, doors, door frames & main gate with ICI gloss paint
Re-varnishing of existing main door
Corrugated paper floor board protection for existing flooring
General cleaning upon completion

*Prices are specific for professional services only, excluding contractor quotation.
^Renovation items are possible standard package by contractor, subject to changes.

SEE ALSO HDB STANDARD FLAT PACKAGE
SEE ALSO HDB PREMIUM FLAT PACKAGE

No comments: